ElectroSAnMBR Before Reverse Osmosis: Cleaner Bilge Water Aboard
Bilge water collects in the lowest parts of a ship: fuel oil and hydraulic fluid washed off decks and machinery spaces, engine room sump contents, washdown from cargo holds, greywater from accommodation. It reaches the treatment plant as an emulsion, with free oil floating and fine droplets of hydrocarbon suspended in brine. On vessels that make fresh water onboard, that stream has to be cleaned far more tightly than a settling tank can manage.
ElectroSAnMBR was built to answer that question. Funded under the European Union's Horizon 2020 programme, the project merges electrolysis, anaerobic digestion and membrane bioreactor technology into a single reactor for shipboard bilge water. Organics are broken down without oxygen, solids are held out by submerged membrane modules, and electrolysis adds cathodic hydrogen alongside anodic oxidising conditions that dismantle emulsified hydrocarbons and refractory dissolved compounds.
Installed as a pretreatment step rather than a replacement for desalination, it shifts the economics of shipboard water production. Seawater reverse osmosis membranes tolerate very little. A film of organics or biofilm raises operating pressure, cuts recovery and turns a cartridge change into an expensive element replacement. Cleaner feed means longer runs between cleanings, which matters when spares sit far from the nearest chandlery.
The work sits in the laboratory and pilot phase, which shapes how the results should be read. The project publishes its objectives, work packages and methods openly, and what follows covers the chemistry, the pretreatment train, and the questions an owner or shipyard faces in Australian waters, where discharge rules, vessel traffic and local engineering capability add their own constraints.
Why Conventional Bilge Treatment Falls Short
Bilge chemistry works against every stage of a conventional train. Coalescing filters and oil-water separators handle free oil and large droplets well, but they barely touch the stable emulsions formed when detergents from accommodation cleaning mix with crankcase oil, and those droplets pass straight into the RO feed. Soluble organics and scale-forming calcium, magnesium and barium arrive alongside them.
In the low shear of the feed channel those organics nucleate a biofilm while the salts precipitate in the concentrate stream. The project's own background piece on traditional bilge water treatment sets out this failure pattern in detail and explains why a combined biological and electrochemical stage responds where separation alone cannot.
The operational consequences are what owners feel. Differential pressure across the elements climbs within weeks, clean-in-place cycles multiply, and usable water per kilowatt hour falls as the pump works against a fouled membrane. Each extra CIP run adds chemical dosing, a shutdown window and technician hours. Element replacement is the line item that turns a pretreatment decision into a budget conversation.
Inside the ElectroSAnMBR Reactor
Three technologies share one vessel. The anaerobic stage needs no aeration blowers, so it avoids the largest energy cost in conventional aerobic bilge plants, and it converts much of the degradable load to methane. That biogas offsets part of the electrical demand of the electrolysis cells on a ship that already runs gas-fired plant.
The membrane bioreactor element is what keeps the footprint compact. Submerged modules retain biomass and suspended solids inside the reactor instead of discharging them to a secondary clarifier, so a high concentration of active culture sits in a small tank and clarified water leaves with very little particulate. For RO pretreatment, that clarity delivers more than gravity settling can.
Electrolysis handles what biology and separation cannot. Cathodic hydrogen creates reducing conditions that help break down chlorinated compounds and destabilise emulsions, while the anode generates oxidising species that attack refractory organics a purely anaerobic system would pass through. Hydrogen comes from water, and dissolved gas can be stripped in-reactor before the stream moves to polishing.
Sizing the Pretreatment Train
A workable arrangement removes in stages what the next stage cannot handle. Coarse screening and an equalisation tank even out slug loads from sumps and tank washes; the ElectroSAnMBR reactor takes out oil, organics and solids together; polishing with granular activated carbon or fine filtration follows, then cartridge filters, then the RO elements. Bypass lines and parallel reactor modules matter more than elegance, since a ship cannot stop making water while one unit is cleaned.
Retrofit decisions dominate in Australia, where the fleet holds charter boats, fishing vessels, offshore support craft and research ships alongside newbuild cruise liners. Yards at Henderson in Western Australia and Osborne in Adelaide handle refit and integration work, and a modular skid is usually easier to fit alongside an existing separator than a full plant replacement. Space, electrical supply and hydrogen venting in enclosed machinery spaces surface first.
Research and expedition vessels are a natural fit for the concept. The CSIRO vessel Investigator, based out of Hobart and working the Southern Ocean, needs reliable potable water and a way to handle what its science decks generate. A closed-loop stage that cuts the volume of waste shipped ashore appeals to an operator who cannot discharge oily bilge at sea.
What the Experimental Programme Is Testing
The project publishes its objectives, work packages, experimental methods, research team and affiliated laboratories, supported by European Union Horizon 2020 funding. Experiments compare reactor configurations against conventional treatment using real bilge matrices rather than clean synthetic water, which is where the emulsions and surfactants that foul membranes actually appear.
The tracked metrics are the ones a shipyard wants: chemical oxygen demand and total organic carbon removal, residual oil and grease, membrane flux and fouling behaviour over time, hydrogen and methane production rates, and electrical energy consumed per kilogram of COD removed. Reporting energy alongside contaminant removal keeps the comparison honest, since a stage that simply shifts the burden onto the ship's generators has solved little.
Dissemination is not an afterthought in a project with this narrow a remit. Specialist knowledge sites such as Neolithic precious beads show how a focused, well-curated archive can serve a small technical readership properly, and the project website plays a similar role for reactor engineering: objectives, work packages, methods and contacts in one place for the people who actually need them.
Australian Waters and Australian Rules
Oil and sewage discharge near Australian coasts is governed through MARPOL and implemented under the National Pollution Guidelines for Coastal Waters, with state agencies layering on licence conditions. Sydney Harbour and Port Botany carry heavy cruise, ferry and commercial traffic, and the sewage overflows Sydney Water has publicly reported keep harbour water quality a live local issue. A new treatment system has to look good on both sides of that argument: cleaner discharge for the port, less waste shipped ashore for the owner.
The Great Barrier Reef adds a second pressure. Queensland charter and liveaboard operators work sensitive waters where a sheen on the surface ends a season's business faster than any fine, and reef operators adopt early anything that reduces what leaves the boat. Coastal fisheries from Cairns to the Torres Strait face the same public and regulatory scrutiny, and they have little appetite for systems demanding constant attention.
Local vernacular matters more than it sounds. Australian crews call a fouled element a headache, call a failed skimmer a pain in the arse, and describe a fix carried out in the afternoon as arvo work. NSW and Victorian crews in particular run equipment hard and fix it later, a habit that low-maintenance pretreatments have to accommodate. Small operators will judge the system by whether a local diesel mechanic in Broome or Gladstone can service it.
Planning a Retrofit on an Existing Vessel
Two lists cover most of what an owner and a yard should talk through before a pilot unit goes on board.
Decisions that shape a retrofit:
- Hydraulic capture, from peak bilge generation in sumps and accommodation to the design flow of the RO plant.
- Footprint and power, including skid space, electrical supply and hydrogen venting in an enclosed machinery space.
- Module redundancy, so one reactor can be isolated for cleaning without stopping the RO plant.
- New build or retrofit, weighing a modular skid against rebuilding an existing separator and polishing train.
- Use of the methane stream for heat or onboard electricity where the vessel already runs gas-fired plant.
- Commissioning and training, matched to local yard capability and a mixed-nationality engineering crew.
Signs that bilge water needs more than a separator:
- A sheen or emulsified oil at the separator outlet that a coalescing cartridge fails to clear.
- Differential pressure across the RO elements climbing within weeks of a new installation.
- Clean-in-place cycles repeating on a short interval, with chemicals leaving the holding tanks as fast as they arrive.
- Biofilm signatures on the RO feed path, including slime deposits and rising ATP readings in the filtrate.
- Calcium or barium carbonate precipitation in the concentrate stream or at the cartridge housing.
For an owner weighing this up, the next step is small and specific rather than a commitment to a new plant. Ask the consortium for the work package reports on reactor performance and energy demand, offer a bilge sample from a vessel that is struggling with fouling, and ask whether a pilot can be instrumented beside an existing RO installation. Those conversations cost nothing and put real ship data in front of the people designing the reactor.
Australian operators who want to move sooner can volunteer a vessel for monitored trials, supply bilge samples for analysis, or follow the pilot results as they come through the project's communication channels. Horizon 2020 funding runs to a schedule, and the vessel trials are the point at which operator involvement changes the outcome. Contact the project team through the ElectroSAnMBR site, bring a fouling log and the list of spare membrane elements carried on board, and the conversation can start with the ship you actually own.